Fabrication, installation and civil engineering of steel structure of Beijing Huateng Datang direct combustion engine room (may 2021 September 2021)
Project content:
1. Fabrication and installation of steel structure, installation of enclosure plate and installation of doors and windows in the construction drawings of direct combustion engine room.
2. Installation of exterior wall enclosure board, doors and windows of fire pump room.
3. The construction of civil engineering of direct combustion engine room includes but is not limited to the backfilling and compaction of indoor ground plain soil, concrete pouring of concrete ground, self flowing paperback finish, equipment foundation decoration surface, drainage ditch and waterproof grate, and outdoor apron.
4. Installation of cooling tower steel structure platform in the construction drawing.
5. Steel structure of direct combustion engine room, cooling tower platform, enclosure board of fire pump house and supporting civil works.