Chimney and water tower demolition works (2018-2020)
1. Mentougou District Hospital chimney protective demolition project (brick concrete, 30m high)
2. Chimney demolition project in Beijing Shougang plant area (reinforced concrete, 80m high)
3. Chimney demolition project of Shougang strip steel plant (brick concrete, 50m high)
4. Water tower demolition project of Sinopec TongZhou Beiyuan oil depot (the tank body is reinforced concrete, and the remaining columns are brick concrete, with a height of 35m)