Demolition of boiler room and affiliated houses of Beijing Shijingshan Hospital

    Demolition of boiler room and affiliated houses of Beijing Shijingshan Hospital

    contact us
    客服电话
    13910070480

    Demolition of boiler room and ancillary buildings of Beijing Shijingshan Hospital (July 2018 August 2018)


    The project is located in the hospital of Beijing Shijingshan Hospital. The project content is the demolition of boiler room and surrounding auxiliary houses. The building is a brick concrete structure with an area of 13200 square meters. The north side of the construction site is close to the outpatient building and inpatient building just put into use. High requirements are put forward for noise control, dust reduction measures and waste soil transportation time during the construction period, Relying on our previous demolition experience, our company reasonably arranged the construction time, made sufficient noise reduction, dust reduction and environmental protection measures, and went all out to ensure that the patient's medical treatment will not be affected during the construction period and the patient's rest will not be affected during the slag discharge period. We successfully completed the task assigned to us by the hospital 10 days in advance, which was highly praised by the owner.



    本站使用百度智能门户搭建 管理登录
    京ICP备2022004964号-1