Heating reconstruction and installation project of Beijing Sports natatorium

    Heating reconstruction and installation project of Beijing Sports natatorium

    contact us
    客服电话
    13910070480

    Heating reconstruction and installation project of Beijing Sports natatorium (June 20, 2021 - July 19, 2021)


    The radiator replacement project of Beijing Sports natatorium is located in Beijing Sports natatorium, No. 1, Songyu South Road, Chaoyang District, Beijing. The project includes: dismantling 52 groups of plate steel radiators and 172m long (de32) PP-R plastic pipes in the original Beijing Sports natatorium, and building 52 groups of cast iron radiators and 172m heating steel pipes (de32);




    Due to the high moisture concentration in the natatorium and the special requirements of the environment on material quality, our company has gone through layers of screening and strict control on the project material selection during the initial bidding quotation, and finally passed the high recognition of the owner. During the construction, the fine installation is carried out in strict accordance with the procedures of humid and hot environment, which has been highly praised by Party A and the supervisor.



    本站使用百度智能门户搭建 管理登录
    京ICP备2022004964号-1